IndigiBuilt installed the Willare Flood Levee, improving flood protection and seasonal access resilience.
IndigiBuilt delivered the Willare Flood Levee Installation to improve flood resilience and protect key infrastructure and land assets. Works included survey set-out, bulk earthworks, engineered levee construction, drainage controls and site rehabilitation, enhancing long-term protection and access during seasonal flooding.